Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Chino, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Chino

Need a roll-off container for your Chino jobsite? A 30-yard roll-off keeps crews moving; swap-out included with driveway boards for clean access.

Jobsite Roll-off Containers for General Contractors

Our fleet of 20-, 30-, and 40-yard roll-offs serves active sites across Chino and San Bernardino; each container features reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers for framers, roofers, and demo crews. We set every bin on protective driveway boards to guard your surface. Call (909) 300-7879 for contractor pricing and tonnage rates regarding our multi-phase hauling agreements.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Chino, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

The 20-yard roll-off measures 20 feet long by 7 feet wide and stands 4 feet tall, with about 2 tons of debris included.

The 20-yard roll-off fits kitchen and bath remodels, single-room demo, and small framing jobs in Chino, California.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Chino, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons of capacity included.

The container handles whole-house remodels, additions, and new-build framing with high walls that fit bulky drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Chino

40-yard construction roll-off

The 40-yard roll-off stretches 22 feet long, 8 feet wide, and stands 8 feet tall, with about 5 tons included for your heavy C&D debris.

Sized for commercial builds and large tear-outs, the 40-yard roll-off is the largest container staged on active sites.

Construction Debris, Drywall, Lumber Acceptance

Our roll-off container accepts the full range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. These materials are sorted at the Chino transfer station to maximize recovery — contractors often manage these heavy loads through commercial recurring hauling agreements. We also follow EPA construction debris recycling guidance to ensure every roll-off stays compliant and efficient.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Chino, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Chino, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Concrete slabs, brick, asphalt, or clean dirt need a strong container. Our reinforced-steel lowboy roll-offs handle up to 10,000 pounds in one trip. The 2-to-3-foot side walls let skid steers and wheelbarrows dump cleanly without pushing past Chino road weight limits. Call (909) 300-7879.

Heavy-debris jobs run on weight tickets from the scale house, not on the yard; the cleanest loads—without mixed wood or trash—earn the lowest per-ton rate. I personally coordinate the tonnage for each container after speaking with the site super, then dispatch your dumpster to match the specific project requirements.

Tonnage Limits and Weight Overage Policy

Every construction roll-off ships with an included tonnage allowance; any extra weight is billed at the per-ton overage rate verified at the scale-house ticket. Your upfront quote lists the total capacity: this helps prevent surprises when the truck weighs in—which is why we track roofing tear-off jobsite containers separately so heavy shingle loads do not consume your mixed-debris allowance for the project.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

Multi-week jobs run on a swap-out rhythm; text or call dispatch when the container is full — we’ll roll a fresh roll-off to the same staging pad on the same or next business day across the Chino metro and San Bernardino.

Step 1

Text dispatch when full

Site supers text a photo and the container number to the dispatcher — no portal logins or ticketing required.

Step 2

Same- or next-day swap

We haul a full container in and drop an empty one on the same staging pad with no minutes lost on the job.

Step 3

Weekend dispatch available

Saturday pulls keep Monday starts clean; coordinate with the dispatcher Friday afternoon.

Insurance and Contractor Account Setup

We handle the paperwork for contractors and property owners in Chino; certificates of insurance are issued before the hooklift rolls out the first bin. Net-30 contractor accounts get set up with consolidated monthly billing and automatic placement across active sites — and that means one phone call to dispatch spins up recurring service.